What a pilot delivers today
Before the window: a snapshot of configuration and state (routing, MAC and ACL tables), forward and reverse path traces for the paths the change touches, and the proposed change assessed against current topology, reachability, security policy and known CVEs. After the window: the configuration diff against that snapshot, the same path traces re-run and the posture checks re-run, including active/standby sync. The outcome and the evidence go into your change ticket.