Glossary · Measurement, pilots and economics

Engineer capacity

Hours returned to the team through faster diagnosis, fewer repeats, less triage and less change and audit work, expressed as FTE-equivalents.

In REAP

The hard-dollar lever; the related figure, −30% operations cost, is a design target from REAP’s reference architecture until a pilot measures it.

Related terms

Bring us your last P1.

Keep the root cause to yourself; in a 30-minute session we walk through how REAP would have investigated it, evidence first. The replay on your own network happens inside the proof of value.